GRIHA
All the queries have been arranged according to GRIHA V 2015. However, the queries belong to all versions of GRIHA. You may search directly through the search bar or by searching new criterion on similar subject.
Criterion 1: Site Selection
- (#8432) Calculation of ground coverage area
- (#7927) Documentation to demonstrate compliance with UDPFI guidelines
- (#7842) Will PMSSY approved plans be acceptable to GRIHA
- (#542)Density interpretation on FSI increase
- Can Canteen be considered as a service in criterion 1, Appraisal 1.1.2?
- Can 1 point be earned if only 3 services are available near the project site?
Criterion 2: Low-impact design
- (#8968) Demonstrate that 50% of the external wall area on unfavorable orientation are abutting buffer zones/service areas
- (#8966) Control Annual Heat Gain through favorable orientation and design of facades
- (#8967) Shadow analysis needs to be done to demonstrate that the shadow of buildings within the GRIHA project boundary do not fall over the "neighboring buildings" outside GRIHA project boundary.
- (#8576) Porus asphalt for roadways and pathways as a SUDS strategy.
- (#8416) Passive design strategies
- (#8415) How to conduct insolation analysis.
Criterion 3: Design to mitigate UHIE
- (#8970) China mosaic tile
- (#8535) High SRI tiles on walkways as a UHIE mitigation strategy.
- (#8276) SRI values for coatings
- (#8262) Exclusions for areas treated with high SRI finishes
- (#604)SRI compliance in cold climates
- SRI value for external pavement
Criterion 4: Site imperviousness factor
Criterion 5: Air and water pollution control
Criterion 6: Preserve & protect landscape during construction
- (#8917) Soil fertility test report
- (#9707) Top Soil
- (#8301) Compensatory tree plantation
- (#8271) Enhancing soil fertility
- (#8212) Plantation requirement and plant factor for native grass
- (#817) Mature trees
Criterion 7: Construction management practices
Criterion 8: Energy efficiency
- (#9738) Building Typology
- (#9737) CPM-Cooling Plant
- (#8937) DG and transformers to be BEE star rate in GRIHA compliance.
- (#8935) If the Lighting Load - External lighting load, Basement area artificial lighting and HVAC load and equipment loads like BHS, Water treatment plant, STP, Escalator/Elevators, PBB,UPS etc. is considered for EPI calculation
- (#8810) Percentage of energy saving achieved through various GRIHA rating variants
- (#8519) EPI benchmark for mixed use building
Criterion 9: Renewable energy utilization
- (#8635) Solar water heating system for renewable energy offset
- (#8631) Percentage of renewable energy offset for a mixed use project
- (#8540) Renewable energy compliance using solar farm within project complex
- (#8452) Renewable-energy Based Hot Water System- non applicability
- (#8447) Sodium oxide fuel cell as a renewable energy source.
- (#8540) Renewable energy compliance using solar farm within project complex
Criterion 10: Zero ODP materials
Criterion 11: Achieving indoor comfort requirements (visual/ thermal/ acoustic)
- (#9718) Skylight norms under GRIHA
- (#8915) Indian Adaptive thermal comfort temperature range
- (#8804) Polycarbonate sheet for meeting the mandatory SHGC requirement
- (#8630) RGB LED lights for exterior lighting not meeting luminous efficacy requirements.
- (#8597) Thermal comfort compliance as per NBC 2005
- (#8594) Is daylight simulation required for enclosed connecting corridors?
Criterion 12: Maintaining good IAQ
- (#8556) CO2 sensors in AHU return air ducts to demonstrate compliance.
- (#8449) Installation of CO2, Temperature and RH sensors in residential projects
- (#7969) PM10 and PM2.5 levels less than prescribed levels
- How can a naturally ventilated residential building achieve points in Criterion 12 – Maintaining good IAQ?
- What are the fresh air requirements for compliance with GRIHA?
Criterion 13: Use of low VOC paints and other compounds in building interiors
- (#8613) VOC content for melamine acoustic panels.
- (#8075) 3rd party certificate for low VOC content
- What is the percentage of VOC in paints to be considered a low VOC paint?
- Is there any norm of VOC for Carpets?
- Are there any norms of VOC for the Vinyl print (multi-color graphics) to be pasted on partition?
- Is there any VOC limit to be followed for Grout?
Criterion 14: Use of low flow fixtures and systems
- (#8622) Can bib-cocks with aerators be used as a low-flow fixture?
- (#8070) Flow rates of plumbing fixture with aerators
- (#795)Building occupancy calculation
- (#713)Online calculator is not equipped to handle the project complexities
- What is the number of uses to be considered in criterion 14 ( Use of low flow fixtures and systems) of GRIHA Version 2015?
- What are the baseline flow rates for water fixtures and flush fixtures for GRIHA Version 2015?
Criterion 15: Reducing landscape water demand
- (#8212) Plant factor for native grass
- (#8149) How to get evapotranspiration data?
- (#8076) Plant factor of barren land
- (#7992) Irrigation system timer control
- (#7958) List of native trees
- (#7923) Water demand for existing trees in undisturbed areas
Criterion 16: Water quality
- (#8500) Water test report for municipal water supply
- (#843) Water quality for irrigation
- Can the average annual quantity of water from on-site water bodies used to capture rainwater be considered to meet per-capita water demand?
- Is providing a Sewage Treatment Plant a mandatory requirement to achieve 3 star rating?
- Does the wastewater treated with a Septic System comply with GRIHA requirements?
- A project is divided into two different phases, out of which only one phase is going for GRIHA rating. A combined STP is proposed for both the phases. So how can the project apply for points in Criterion 21 (GRIHA Version 03)?
Criterion 17: On-site water reuse
- (#8616) Can MBBR STPs which use UV lamps instead of hypochlorite for disinfection be considered chemical free STPs?
- (#8604) Is STP located in an adjacent plot owned by the same client accepted in GRIHA?
- (#8604) Is STP located in an adjacent plot owned by the same client accepted in GRIHA?
- (#8576) On-site water reuse for part of a township project.
- (#8180) Laundry water consumption for reuse calculations
- (#8179) STP treated water discharge during monsoon
Criterion 18: Rainwater recharge
- (#8526) Groundwater level testing on contoured site
- (#8479) Non-applicability for ground water recharge
- (#8462) Demonstrating non-applicability for ground water recharge
- (#8364) Rain water recharge using peak hourly rainfall.
- (#8135) Sizing of RWH system
- (#8206) Multiple queries for project with large rocky site area
Criterion 19: Utilization of BIS recommended waste materials in building structure
- (#8567) Replacement of OPC with fly-ash in Grade slab and definition of structural work.
- (#8566) Documents required if AAC blocks are being used in a project.
- (#8241) Low energy materials in differnt categories
- (#8233) Procedure to calculate the total percentage of cement replaced with fly ash
- (#485) Solar PV for Hot water generation
- (#588)Is recycled Aggregate considered BIS recommended waste?
Criterion 20: Reduction in embodied energy of building structure
- (#8627) Can a project score points under Criterion 20 by using PPS and AAC blocks for construction
- (#8546) Documentation for embodied energy calculations
- (#8482) Embodied energy calculation
- (#8487) Testing of walling block for recycled content
- (#7850) Low energy walling material
- (#8035) Embodied energy reduction
Criterion 21: Use of low-environmental impact materials in building interiors
- (#8827) Paver blocks with fly ash contents
- (#8596) Submission requirements for Low impact materials in building interiors.
- (#8499) Finishes to be considered in low energy material calculation?
- (#8082) Documentation requirement for rapidly renewable wood.
- (#580)Are UPVC frames considered as low energy material
- (#574)Is quarry dust considered an industrial waste in GRIHA
Criterion 22: Avoided post construction landfill
- (#576) Visitor population for water and waste calculations
- What category of waste generation norm should be considered in case of medical consultation rooms, labs or minor OT?
- Will a project which is part of an existing campus get points in Criterion 24 (GRIHA Version 03) if the waste is being sent to a centralized facility?
- Does the builder need to supply following things for attaining 3 star pre certification : 1) solar thermal system 2) garbage chute 3) rain water harvesting
Criterion 23: Treat organic waste on site
- (#8608) Waste generation as per NBC 2005 in a GRIHA v3 project.
- (#8337) Organic waste calculation for large mixed-use development
- (#8221) Organic waste calculation for a hotel project.
- (#8201) Organic waste treatment using crusher
- (#8031) Quantification of wet waste generation
- Can vermi composting be done off-site or should it only be done on site for meeting the requirements of Criterion 25 (GRIHA Version 03)?
Criterion 24: Labor safety and sanitation
Criterion 25: Design for universal accessibility
Criterion 26: Dedicated facilities for service staff
- Area of service staff restrooms
- (#8219) Calculation of number of service staff for providing dedicated resting room
- (#8158) Dedicated facilities for service staff on campus outside GRIHA virtual boundary
- (#814) Facilities for service staff as innovation point
- (#8126) Can service toilets and disabled toilets be the same?
Criterion 27: Increase in environmental awareness
Criterion 28: Smart metering and monitoring
- (#9736) Smart metering and monitering
- (#8971) The project is a medical campus having a Hospital, college, lab, residential towers, workshop, etc.
- (#8977) The project has proposed to use 2845 TR Centralized Chilled water system in the Enclosed Mall, Commercial Loft (Studio Apartment & Offices) & Multiplex spaces.
- (#8976) Smart metering
- (#8953) smart meters with RS485/RS232 port
- (#8826) Separate energy meters for HVAC and interior and exterior lighting
Criterion 29: Operation, maintenance protocols
- Who conducts the energy audit for demonstrating compliance with Criterion 32 (GRIHA Version 03)?
- When is the energy audit conducted for demonstrating compliance with Criterion 32 (GRIHA Version 03)?
- Is it necessary to install meters and sub-meters at individual dwelling unit level or they can be installed at common area level in an apartment?
Criterion 30: Performance assessment for final rating
- (#8558) Specifications for Electric Vehicle charging points.
- (#8537) Innovation points for parking management system
- (#8537) Innovation points for parking management system
- (#767) 2-way communication with GRIHA platform
- Documentation submission for audit and validation
- Audit for Energy, Thermal & Acoustic, Water and Visual parameters
Criterion 31: Innovation
- (#8807) Solar-powered Street light lamps
- (#8122) Electrical vehicle charging points as an innovation strategy.
- (#876) Innovation point for E-charging slots
- (#846) Green walls
- (#648)Low smoke electrical cables as innovation point
- (#8129) THD Controller for innovation