A project is divided into two different phases, out of which only one phase is going for GRIHA rating. A combined STP is proposed for both the phases. So how can the project apply for points in Criterion 21 (GRIHA Version 03)?

Query

A project is divided into two different phases, out of which only one phase is going for GRIHA rating. A combined STP is proposed for both the phases. So how can the project apply for points in Criterion 21 (GRIHA Version 03)?

Solution

Criterion 21 will be applicable to the project and the points will be denied if STP is not installed during rating process. 