Criterion 8: Energy efficiency
- (#7965) Chilled water supply from LPG process plant
- (#7960) Power factor correction capacitors in residential project
- (#7943) Software for simulation under Criterion 8 and 11
- (#7897) Inclusion of renewable energy in EPI calculations
- (#7801) Transformer ECBC compliance
- (#7788) EPI calculations
- (#818) Controls for artificial lighting
- (#676)Fresh Air modeling in energy simulation
- (#670)Ceiling fan connected load for energy simulation
- (#605)Energy modeling schedule for airport
- (#543)Climate classification as per ECBC and NBC
- (#533)EPI for Data Centers
- (#491)ECBC mandate 8.2.5- Power cabling
- (#449)EPI calculation methodology for public buildings
- HAP software for energy simulation
- What LPD to be considered in the model?
- Areas and equipment to be included in EPI calculations
- Daylight analysis for a college building
- Requirement for automatic lighting controls for ECBC compliance in a residential building
- What will be the EPI for a naturally ventilated hostel building?
- Since ECBC 2017 has been released, should GRIHA projects comply with the requirements of ECBC 2017?
- What should be the Energy Performance Index (EPI) for airports?
- Is the ECBC clause for motors applicable to a naturally ventilated residential building?
- Are motors running for less than 1500 hours per year exempted as per ECBC?
- Can we reuse Air Conditioners from another building in a GRIHA project?
- Should the project comply with ECBC mandate in case of an existing transformer?
- What details to consider in case for submersible pumps to demonstrate compliance with ECBC?
- What occupancy should be considered for calculations in case of 1 BHK apartments?
- Will the project be eligible for GRIHA Rating, if it does not meet any one of the mandatory compliance measures recommended in ECBC?
- Is it still necessary to fill the online calculator after attaching the energy simulation report containing EPI calculation?