Query
Please suggest the Energy Modeling schedule for new Airport Building or should we consider it from ECBC 2017 (Assembly Building Schedule)
Response
The building schedule must be consistent with building operation and building typology. The building operation needs to be supported by DBR (Design Basis Report) of the project developed by competent authority / building owner.