Query
The HVAC Consultant for the project has provided ASHRAE 62.1+30 % extra. Are we supposed to model minimum fresh air as per ASHRAE or add 30 % extra for simulation purpose?
Response
Project needs to model only for minimum fresh air requirement as per ASHRAE 62.1 or as per NBC 2005.