- (#8984) Built-up area per capita threshold range for a building used for transport terminal purposes
- (#8924) Virtual Boundary Creations?
- (#8631) Building typology for GRIHA v 2019 project with multiple buildings
- (#8585) Size of GRIHA logo to be displayed on site.
- (#8554) Which typology to be considered for a project with canteen building.
- (#8543) Variant and typology for transit terminal project.
- (#8549) Multiple queries for EPC project.
- (#8536) Registration for fruit and vegetable market project.
- (#8534) How to choose rating variant?
- Virtual site boundary
- (#8515) Rating of project with a few operational buildings.
- Virtual site boundary
- (#8263) Climate classification for Guwahati
- Timeline of GRIHA projects
- (#659)GRIHA LD- Provisional rating
- How we calculate rating chart after reduction of non-applicable clause?
- How famous has the GRIHA rating system been for stand-alone domestic buildings?
- How to convince client to go for GRIHA EB (other than EE)?
- Is there a specific format for uploading the clarifications to the comments raised by GRIHA Council after the first review?
- How long does it take to get GRIHA Certification? What is the process for getting the Certification?
- Can the documentation be submitted partially?
- Where can we find the list of documents to be submitted for each criterion?
- Is it necessary to submit the project drawings in CAD format to demonstrate compliance?
- How does GRIHA support a project in getting certification?
- At what stage of the building construction / operation is the rating conferred?
- Is the checklist for GRIHA version 2015 available? If yes, can we have a copy of the excel file?
- What is the process of SVAGRIHA RATING?
- What is the acceptable format for submitting compliance documents for SVAGRIHA certification?
- We wish to register our project for SVAGRIHA which is in the design stage. What kind of assistance is provided by GRIHA Council during the whole registration and documentation process?
- Can pre-certification be done for SVAGRIHA projects?