Rating/Documentation Process
- What kind of help does GRIHA provide for SVAGRIHA projects?
- How many subsequent stages of submission are in the GRIHA LD certification process?
- If a township is awarded GRIHA - LD rating, do the buildings have to be certified as well? If yes, is the process separate?
- What is the difference between the drawings required for GRIHA LD certification and GRIHA certification?
- For Master plan rating, do we need to submit the documents for the complete site or only for phase 1? What about the documents for subsequent stages?
- Our project is registered for master plan rating and is under construction. At the current stage of construction, we do not have any photographs to demonstrate compliance. How can we upload the images to complete submittal?
- Is there a specific format in which the narratives need to be submitted? Kindly provide some samples for reference.
- What is GRIHA provisional rating?
- What is the duration of the evaluation process?
- What is the evaluation process?
- When can the project submit the documentation?
- Is GRIHA rating applicable to industrial projects as well?
- Is a certified professional required to prepare the documentation for GRIHA rating?