Should AC schedule be modeled for a project where the developer has not given provision for AC electrical point or drain?

Query

Should AC schedule be modeled for a project where the developer has not given provision for AC electrical point or drain?

Solution

If the cost per flat is less than 25 Lakh rupees or it is 1 BHK, the project can be modeled as non AC. However, if these conditions are not met, then the project will have to assume ACs as applicable for all other residential projects. Please refer https://grihaservice.zendesk.com/hc/en-us/articles/207271029-Can-1-star-AC-be-considered-for-energy-simulation-purpose-if-there-are-no-AC-s-installed-in-an-apartment-Will-this-suffice-the-requirement-of-thermal-comfort-criterion-14-GRIHA-Version-3-in-residential-building-
The final rating, in any case, is dependent on actual audit; any additional saving will affect the final rating positively.