What documents are needed to demonstrate non- applicability in Criterion 21 (GRIHA Version 03)?

Query

There is a non-applicability condition in Criterion 21 (GRIHA Version 03) if ground water table is high and ground water recharge is not possible. In such a situation, what kinds of documents or reports are required to substantiate the same?

Solution

A report will be required from the Central Ground Water Board (CGWB) stating that ground water recharge is not permissible at site due to high groundwater levels.