Query
Can I get all points in criterion 18 (GRIHA Version 3) by off-site renewable energy installation?
Solution
In criterion 18 (GRIHA Version 3), out of a total of 8 points, 6 points are awarded for on-site application of renewable energy. 2 points are awarded for on-site or off-site application of renewable energy which caters to 100% of internal artificial lighting energy consumption. So the project will be able to achieve the last two points here. For the first 6, they would have to install on-site renewable energy system.