(#8194) Submission requirement for energy consumption

Query

In order to demonstrate energy reduction in annual energy consumption,is the project required to submit  the base case and existing case energy consumption calculation along with monthly energy bills for both base case and existing case?

Solution

Simulations will not be required. Projects which have operational data of less than 3 years are required to conduct an energy audit by a BEE certified auditor and submit an energy audit report.

For more information, please refer to the GRIHA EB manual.