Query
How does GRIHA Council help the project management team to ensure that the site work is in compliance with GRIHA criteria?
Solution
GRIHA Council conducts 3 mandatory site visits during the entire construction period of the project. It provides a link between the evaluators and the site construction practices. Also it helps to keep a check on the site construction activity and quality. 3 site visits are mandatorily linked with the construction procedure and time line for the project. However, the number of site visits can be increased if a project needs more attention and hand holding to comply with GRIHA criteria.