Query
What method/ thumb rule can be used to calculate the annual building energy consumption for the Phase 2 buildings of a project as energy simulation for the proposed phase 2 is not possible in the absence of architectural and energy data.
Solution
The Phase 2 buildings should be an extrapolation of assumptions taken in phase 1 buildings. The assumptions must be arrived on after a rigorous discussion between the architect, consultants and the client.