Query
Would a project be eligible for precertification If it’s in a preliminary stage with no approval drawings?
Solution
GRIHA Precertification will not be feasible at the mentioned stage of the project. The project team must have detailed layout drawing and services schemes for the proposed project to apply for GRIHA Precertification